Cableways Models 60M/T & 100M/T
For short to medium term gauging studies, the Riverina and Barossa Winches can be quickly mounted on the operating side support post, the discharge measurements taken and the winch packed up and moved to the next site. For permanent or long-term installations,… Read more
Operating & Far Side Post | Galvanised Steel |
Post Heads | Structural Alloy & Stainless-Steel Axles |
Main Cable | 12mm Galvanised Steel |
Traversing Cable | 2.5mm or 3.2mm Stainless Steel Wire Rope |
Sounding Cable | 2.5mm or 3.2mm Amergraph Cable |
Span | Up to 125m |
Compliance | Meets ISO4375 requirements |
Optional Beacon | for Visual and Sound Alert (ON/OFF switch, Battery Box, car charger, battery not supplied) |
For short to medium term gauging studies, the Riverina and Barossa Winches can be quickly mounted on the operating side support post, the discharge measurements taken and the winch packed up and moved to the next site. For permanent or long-term installations, the winch is generally located in a hut.
HyQuest Solutions gauging winches and travellers are based on the long-established approach to obtaining current meter observations and sediment samples in streams. All winches and Travellerways are manufactured under Quality Assurance Standards which are accredited to ISO 9001. The application for Travellerways is in locations where there is no bridges or the stream is unsuitable for safe boat gauging.
-
TRAVELLER-BLOCK-Beacon
-
TYPICAL CABLEWAY INSTALL-beacon